None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#36 Changes by Benjamin Reed and [unknown]

#37 Changes by Benjamin Reed and [unknown]

1 build

36 minutes

  • Average time to fix a failure: 36 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 36 minutes, from failure starting in build #36.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #36.